Our reactive maintenance team attended a retail centre in order to repair brickwork in response to a health and safety report. They cleared loose brickwork, added mortar mix and new bricks and levelled.

RECENT JOBS

Groundworks

Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.

2020-08-24T18:49:21+02:00
Go to Top