Two man groundworks team attended a central London commercial location.Lifted slabs that were causing a trip hazard and set aside while base was cleaned out. Relayed slabs with sharp sand so that level with existing slabs.Raked out all loose mortar joints in slabs.Re-pointed all mortar joints in the slabs
RECENT JOBS
Leak Detection & Repair
Another Leak Successfully Resolved at Sunbury Cross Shopping Centre
Fire Escape Gate Enhancement
Fire Escape Gate – Security Upgrade Completed
New Speed Bumps
Keeping Your Property Safe and Accessible: Speed Hump Repairs by SPA Ltd
Access Hatch Install
A Job Well Done at Arlington Square
Brick Wall Rebuild
Rebuilding Strength, Brick by Brick
Decorating
Decorating team attended office building and redecorated and refreshed the communal areas.









