Our reactive team attended in order to repair a defective fence. Removed fence panels, lifted block paving and dug out broken fence post. Installed new 100x100mm fence post. Concrete in place. Refit fence panels
RECENT JOBS
Commercial Roof Repair
Carried out all repairs required to prevent future leaks.
Fence Repair
Our fencing team attended an industrial centre to repair a fence damaged by reversing lorries.
Line Marking
Line marking team attended site to a London based office block to reline the car park and add additional green parking bays.
Decorating
Decorating team attended office building.
Line Marking
Line marking team attended office car park. Supplied and applied thermoplastic on tarmac.
Groundworks
Groundworks team attended site and repaired broken kerbs and pavement slabs.