Our reactive maintenance team attended an industrial site where reports of landlord’s street lighting being faulty had been made.

They found a termination in the timer housing had been incorrectly installed. Terminated in the correct terminal and checked. Left all landlords lights working.

RECENT JOBS

Groundworks

Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.