Our carpentry team attended a Mayfair office building in order to restore the vanity units in the washrooms that had suffered water damage. They:
- Supplied and installed replacement doors to the:
– 5th,4th,3rd and 2nd female
– 4th , 3rd and 2nd male - replaced Vanity Panel @ 462mm x 462mm on 18mm MR MDF core faced front & rear in Alpi wood veneer laminate 10.97 both sides. Hardwood Oak lipped.
- Concealed all edges with a stain finish as close as possible to laminate colour. Each panel drilled for 3 hinges.
- Supplied and fit new hinges to each door.
RECENT JOBS
Leak Detection & Repair
Another Leak Successfully Resolved at Sunbury Cross Shopping Centre
Fire Escape Gate Enhancement
Fire Escape Gate – Security Upgrade Completed
New Speed Bumps
Keeping Your Property Safe and Accessible: Speed Hump Repairs by SPA Ltd
Access Hatch Install
A Job Well Done at Arlington Square
Brick Wall Rebuild
Rebuilding Strength, Brick by Brick
Decorating
Decorating team attended office building and redecorated and refreshed the communal areas.







