Our carpentry team attended an industrial site in oder to replace a widen ramp that had been highlighted in a health and safety review. The team made the ramp offsite – removed old ramp and installed new ramp.

RECENT JOBS

Electrical

Electrician attended site and gained access to distribution board and found breaker had tripped. Reset breaker and checked lights.

Glazing

Supplied and fitted toughened and laminated safety glass double glazed unit to office window.

2022-07-19T15:36:55+02:00
Go to Top