Construction of smoking shelter and associated groundworks

Construction of smoking shelter and associated groundworks

Supplied, delivered  and assembled an open fronted smoking shelter 2m x 1m (For 3-5 people)

Lifted paving slabs to be able to concrete feet into the ground if just fixed to slabs there will be a risk of it dislodging in strong winds

Colours – black, light grey, blue or green

Installed a hooded top tower smoking bin in stainless steel

Compliant with Smoking Ban Legislation – Parliament Act 3368


Steelwork is zinc and epoxy powder coated for effective corrosion resistance and longevity

RECENT JOBS

Electrical

Electrician attended site and gained access to distribution board and found breaker had tripped. Reset breaker and checked lights.

Glazing

Supplied and fitted toughened and laminated safety glass double glazed unit to office window.

2023-01-11T18:11:22+02:00
Go to Top