Our reactive maintenance team attended a central London commercial office in order to repair an access door that wasn’t operational. Bottom door shoe and door floor mounted closer were replaced.

RECENT JOBS

  1. 1
  2. 2
  3. 3
  4. 4

Groundworks

Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.

2022-02-14T19:00:17+02:00
Go to Top