A Job Well Done at Arlington Square
Our engineers were recently on site at Arlington Square, where they installed a new access hatch to repair and tidy up a hole in the ceiling.
The new hatch not only fixed the issue but also makes future maintenance that bit easier — a smart, safe, and tidy solution all round!
Big thanks to the team for another great job done with care and attention to detail. 👏
At SPA Ltd, we’re proud to keep our clients’ buildings safe, functional, and looking their best.
RECENT JOBS
New street lights
Electrical installation team fitted 3 new 6 meter street lights in commercial office car park with LEDs. This included groundwork in order to install new electrical cabling for the lights.
Installation palisade fence
Planned maintenance team installed a fabricated palisade fence at an industrial site in order to enhance the security of the site.
Installation Aco drain
Groundworks team installed removed existing damaged drainage channel and installed new ACO drain.
Refurbishment of Fire Escape
As part of a planned maintenance schedule in response to a Fire Risk Assessment we cleaned , applied non slip finish , highlighted nosings, painted fire door and applied D-handle to fire escape and fire exit.
Door Frame Repair
Our carpentry team responded to a reactive maintenance request to repair the door frame of the ladies toilets in an office building.
Fitting of Hand Dryer
Fitting of a new hand dryer in ladies tiles of office as part of a refurbishment.









