A Job Well Done at Arlington Square
Our engineers were recently on site at Arlington Square, where they installed a new access hatch to repair and tidy up a hole in the ceiling.
The new hatch not only fixed the issue but also makes future maintenance that bit easier — a smart, safe, and tidy solution all round!
Big thanks to the team for another great job done with care and attention to detail. 👏
At SPA Ltd, we’re proud to keep our clients’ buildings safe, functional, and looking their best.
RECENT JOBS
Road Resurfacing
Road resurfacing at health club by digging out arisings laying concrete and then a top covering of tarmac.
Installation of ramp
Installation of ramp at office building as part of planned maintenance review following a heath and safety audit.
Installation of wooden fence replacement
Carpentry and security requirement - installing a wooden fence to prevent access to the site through a hedge by third parties.
Refurbishment
Refurbishment of central London office as part of a planned maintenance schedule. Decorating of walls and all wood.
LED Installation
Planned maintenance at an industrial trading site. Electrical installation to replace all existing light fittings with LED light fittings.
Height Restrictor
As part of a planned maintenance schedule we fabricated and fitted a height restrictor at a retail park to improve traffic management.









