Our groundworks team attended a commercial site to install 6m cantilever cycle shelter. Lifted 3 areas of block paving and dug holes to depth specified by shelter manufacturers, installed uprights and concreted in and then re-set the block paving.
RECENT JOBS
Groundworks
Groundworks team attended site and repaired broken kerbs and pavement slabs.
Groundworks – Health & Safety
Groundworks team attended retail park. Cut out tarmac ready for new tarmac to be laid. Re-laid tarmac to fill potholes.
Groundworks
Groundworks team attended retail park in Peterborough to replace aco drain and channel. Broke out existing drain and channel and supplied and fitted new.
Plumbing – Drainage
Drainage team attended residential property that had severe drain blockages.
Groundworks
Groundwork team attended commercial car park to reset corner stone. Cleaned all old mortar from stone and cleaned base. Reset with new mortar.