Our groundworks team attended a commercial site to install 6m cantilever cycle shelter. Lifted 3 areas of block paving and dug holes to depth specified by shelter manufacturers, installed uprights and concreted in and then re-set the block paving.
RECENT JOBS
Street lighting repair
Our reactive maintenance team attended an industrial site to repair street lighting
Bike Shelter
Assemble and Install a gated bike shelter to encourage sustainability
Entrance Repair
Our reactive maintenance team attended a commercial office to repair the entrance
Speed bumps
Our reactive team attended a leisure complex to install new speed bumps
Paint edging
Our planned maintenance team attended an office building in response to a health and safety report.
Bathroom refurbishment
Our planned maintenance team attended a business park for a bathroom refurbishment