Our groundworks team attended an office centre after a number of heavy goods vehicles had damaged the block paving. They lifted sunken block paving. Filled sunken area with sand and ballast to bring the level up. Cleaned all paviours and reset. Swept in kiln dried sand.
RECENT JOBS
Refurbishment of disabled toilet.
Refurbishment of disabled toilet.
Emergency Repair of Bollard
Emergency repair of bollard hit by a vehicle.
Tiling of Bathroom
Tiling of Bathroom
Rubbish Removal
Safe removal of rubbish.
Installation of Microwave Sensors
Installation of microwave sensors on stairs.
Hazard Strips
Installation of hazard strips to ensure that health and safety issues don’t occur in plant room.