Our plumbing and heating team attended a retail premises in order to

Decommission and remove the existing boiler – remove the existing flue – supply and fit x1 24kw combi boiler

Supply and run x1 horizontal flue terminating outside ( next to the window ) terminating outside

Supply and apply system inhibitor

Supply and fit x1 thermostat

Dispose old boiler to regulation

Fill up the system and test everything is working okay and show site contact exactly how the system works

RECENT JOBS

Groundworks

Groundworks team attended retail park in Peterborough to replace aco drain and channel. Broke out existing drain and channel and supplied and fitted new.

Groundworks

Groundwork team attended commercial car park to reset corner stone. Cleaned all old mortar from stone and cleaned base. Reset with new mortar.

Electrical

Electrician attended site and gained access to distribution board and found breaker had tripped. Reset breaker and checked lights.