Our plumbing and heating team attended a retail premises in order to
Decommission and remove the existing boiler – remove the existing flue – supply and fit x1 24kw combi boiler
Supply and run x1 horizontal flue terminating outside ( next to the window ) terminating outside
Supply and apply system inhibitor
Supply and fit x1 thermostat
Dispose old boiler to regulation
Fill up the system and test everything is working okay and show site contact exactly how the system works
RECENT JOBS
Roof inspection and repair
Our commercial roofing team travelled to The Midlands to inspect and repair a roof suffering from water ingress.
Replacement of faulty lights
Our electrical team attended an emergency call out and replaced faulty lights.
Brickwork at retail centre
Our reactive maintenance team attended a retail centre in order to repair brickwork in response to a health and safety report.
Car park Lining
Our planned maintenance team attended a commercial premises and supplied and applied Thermoplastic road line material to form markings.
Installation of bollard sleeves
Our reactive maintenance team attended a retail/industrial site and fitted bollard sleeves securely.
Installation of bird boxes
Our bird appreciation team installed numerous bird boxes at a commercial premises in order to encourage nesting.