Our plumbing and heating team attended a retail premises in order to
Decommission and remove the existing boiler – remove the existing flue – supply and fit x1 24kw combi boiler
Supply and run x1 horizontal flue terminating outside ( next to the window ) terminating outside
Supply and apply system inhibitor
Supply and fit x1 thermostat
Dispose old boiler to regulation
Fill up the system and test everything is working okay and show site contact exactly how the system works
RECENT JOBS
Fire exit refurbishment
Our planned maintenance team attended a sports complex as the areas around the fire exits needed decorating and refurbishing.
Increased bike rack capacity
Our reactive team installed temporal bike parking in the carpark of a commercial building so that employees could avoid public transport during the corona
Liquid resin treatment for roof
We attended a commercial premises for applying a liquid resin treatment to prevent water ingress.
Internal refurbishment
Our refurbishment team attended a commercial building.
Roof survey
Due to water ingress we carried out a detailed inspection.
Canteen refurbishment
Following a fire risk assessment that identified a hatch that was not fire rated our team attended and removed the hatch and replaced with one that met fire rating standards.