Our plumbing and heating team attended a retail premises in order to
Decommission and remove the existing boiler – remove the existing flue – supply and fit x1 24kw combi boiler
Supply and run x1 horizontal flue terminating outside ( next to the window ) terminating outside
Supply and apply system inhibitor
Supply and fit x1 thermostat
Dispose old boiler to regulation
Fill up the system and test everything is working okay and show site contact exactly how the system works
RECENT JOBS
Fire extinguisher installations
In response to a Fire risk Assessment our reactive maintenance team attended an industrial complex. They installed fire extinguishers and suitable signage through out the unit.
Hand sanitiser station
Or reactive team visited a commercial office in order to supply and instal a hand sanitiser station to ensure that the site complied with the Health and Safety guidance to combat the corona.
Signage to ensure building corona ready
Our reactive team attend a client site and fixed signage throughout the building to ensure compliance with all health and safety requirements prior to the premises being reoccupied post corona.
Corona Ready Office
Our reactive team visited a commercial office to install star signage, lift signage, screens and sanitiser stations.
Refurbishment of retail premises
Our refurbishment team attended a retail premises that was closed due to the corona.
Refurbishment
Our refurbishment team team attended a commercial premises to take advantage of the areas being quiet during the corona lock down period