Our plumbing and heating team attended a retail premises in order to
Decommission and remove the existing boiler – remove the existing flue – supply and fit x1 24kw combi boiler
Supply and run x1 horizontal flue terminating outside ( next to the window ) terminating outside
Supply and apply system inhibitor
Supply and fit x1 thermostat
Dispose old boiler to regulation
Fill up the system and test everything is working okay and show site contact exactly how the system works
RECENT JOBS
Installation of Lightweight Steel Frame external walling residential block
Installation of the SFS infill external walls before fitting the fire rated cladding and insulation.
External envelope education extension
Cladding of new build extension . The unusual angles formed by the design were a challenge but the resulting effect was worthwhile.
Feature soffit and canopy commercial building
Installation of a new curved feature soffit and canopy to the entrance of this prestigious City building.
Kerb replacement
Our groundworks team attended an industrial site to dig and replace broken kerbs.
Adapting electric entrance barriers
To install switches into each car park barrier so they can be turned off individually.
Emergency lock replacement
Team attended a commercial building and identified, sourced and replaced lock.