Our plumbing and heating team attended a retail premises in order to
Decommission and remove the existing boiler – remove the existing flue – supply and fit x1 24kw combi boiler
Supply and run x1 horizontal flue terminating outside ( next to the window ) terminating outside
Supply and apply system inhibitor
Supply and fit x1 thermostat
Dispose old boiler to regulation
Fill up the system and test everything is working okay and show site contact exactly how the system works
RECENT JOBS
Road Resurfacing
Road resurfacing at health club by digging out arisings laying concrete and then a top covering of tarmac.
Installation of ramp
Installation of ramp at office building as part of planned maintenance review following a heath and safety audit.
Installation of wooden fence replacement
Carpentry and security requirement - installing a wooden fence to prevent access to the site through a hedge by third parties.
Refurbishment
Refurbishment of central London office as part of a planned maintenance schedule. Decorating of walls and all wood.
LED Installation
Planned maintenance at an industrial trading site. Electrical installation to replace all existing light fittings with LED light fittings.
Height Restrictor
As part of a planned maintenance schedule we fabricated and fitted a height restrictor at a retail park to improve traffic management.