Our plumbing and heating team attended a retail premises in order to
Decommission and remove the existing boiler – remove the existing flue – supply and fit x1 24kw combi boiler
Supply and run x1 horizontal flue terminating outside ( next to the window ) terminating outside
Supply and apply system inhibitor
Supply and fit x1 thermostat
Dispose old boiler to regulation
Fill up the system and test everything is working okay and show site contact exactly how the system works
RECENT JOBS
Replacement of Lighting in Car Park
Reactive maintenance to restore lighting in carpark in order ensure security and health and safety on compromised.
Thermoplastic road markings
Application of thermoplastic road markings
Roof Repairs
Reactive maintenance commercial roof repair involving the sealing of up stands and joints in roof felting due to a roof leak.
Resetting of granite setts
Resetting of granite setts and road resurfacing on roadway at office building complex as part of planned preventive maintenance.
Installation of steel bollards
Installation of steel bollards to separate pedestrians at retail centre.
Installation of fabricated gate and fence
Fabrication of gates and fencing at industrial complex to enhance security as part of planned preventive maintenance programme.