Our plumbing and heating team attended a retail premises in order to
Decommission and remove the existing boiler – remove the existing flue – supply and fit x1 24kw combi boiler
Supply and run x1 horizontal flue terminating outside ( next to the window ) terminating outside
Supply and apply system inhibitor
Supply and fit x1 thermostat
Dispose old boiler to regulation
Fill up the system and test everything is working okay and show site contact exactly how the system works
RECENT JOBS
Electrical Earthing Point
Uplift and relay of pavement in order to upgrade earthing rod to ensure compliant with regulations.
Lead Guttering Using Harnesses
Lifting and replacement of lead guttering following resin patch repairs using harnesses.
Gutter Repair
Repair of guttering preventing water ingress at residential flat.
Cleaning External
Cleaning and refreshing external parts of commercial building prior to being relet.
Boarding Up
Emergency call out to board up broken window on 3rd floor of office.
Loose Steps
Lifted and reattached front steps to commercial office to remove trip hazard.