Our groundworks team visited an industrial site in order to replace a bollard (set in block paving) that had been damaged by an HGV.

RECENT JOBS

Groundworks

Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.

2022-02-09T11:41:19+02:00
Go to Top