Our reactive maintenance team attended a retail centre in order to repair brickwork in response to a health and safety report. They cleared loose brickwork, added mortar mix and new bricks and levelled.
RECENT JOBS
Increased bike rack capacity
Our reactive team installed temporal bike parking in the carpark of a commercial building so that employees could avoid public transport during the corona
Liquid resin treatment for roof
We attended a commercial premises for applying a liquid resin treatment to prevent water ingress.
Internal refurbishment
Our refurbishment team attended a commercial building.
Roof survey
Due to water ingress we carried out a detailed inspection.
Canteen refurbishment
Following a fire risk assessment that identified a hatch that was not fire rated our team attended and removed the hatch and replaced with one that met fire rating standards.
Drainage channel replacement
Our groundworks team attended a commercial premises.