Our reactive maintenance team attended a retail centre in order to repair brickwork in response to a health and safety report. They cleared loose brickwork, added mortar mix and new bricks and levelled.

RECENT JOBS

CCTV

Installation of a lamp post and cctv camera at a site that was susceptible to fly tipping

2020-08-24T18:49:21+02:00
Go to Top