Our planned maintenance team attended a commercial premises and supplied and applied Thermoplastic road line material in accordance with EN 1871 to form markings.
Markings included.
Single and Double arrows
Central road lines
3x Junctions
Lettering in the Visitors parking area
Entire line along the top of the main car park covering bays and junctions out of each row
RECENT JOBS
Groundworks
Groundworks team attended retail park in Peterborough to replace aco drain and channel. Broke out existing drain and channel and supplied and fitted new.
Plumbing – Drainage
Drainage team attended residential property that had severe drain blockages.
Groundworks
Groundwork team attended commercial car park to reset corner stone. Cleaned all old mortar from stone and cleaned base. Reset with new mortar.
Electrical
Electrician attended site and gained access to distribution board and found breaker had tripped. Reset breaker and checked lights.
Installation of Lightweight Steel Frame external walling residential block
Installation of the SFS infill external walls before fitting the fire rated cladding and insulation.