Our planned maintenance team attended a commercial premises and supplied and applied Thermoplastic road line material in accordance with EN 1871 to form markings.
Markings included.
Single and Double arrows
Central road lines
3x Junctions
Lettering in the Visitors parking area
Entire line along the top of the main car park covering bays and junctions out of each row
RECENT JOBS
Construction of smoking shelter and associated groundworks
Supplied, delivered and assembled an open fronted smoking shelter
Refurbishment / decoration of waste bin area
Our team attended a commercial office building for refurb and decorating
Electrical works
Our electricians attended a commercial office building due to a flatly floor socket. Tested socket - made safe. Returned to site and replaced damaged socket
Line Marking
Additional numbered parking was required at a retail site.
Repair of Totem sign at retail park
Carry out an initial survey of the totem sign utilising a powered access machine to assess the existing framework and fixings. Advised on additional supports required internally to add strength.
Roof and gutters
There were reports of water ingress effecting an industrial premises so our gutters team were sent to investigate.