Our planned maintenance team attended a commercial premises and supplied and applied Thermoplastic road line material in accordance with EN 1871 to form markings.
Markings included.
Single and Double arrows
Central road lines
3x Junctions
Lettering in the Visitors parking area
Entire line along the top of the main car park covering bays and junctions out of each row
RECENT JOBS
Installation of roof railing
Installation of roof railing following health and safety review.
Installation of stair nosing
Installation of stair nosing at retail centre to prevent health and safety hazard.
Installation of floodlights and electrical testing
Installation of floodlights and electrical testing.
Replacement of Loose Slabs
Groundwork replacement of loose slabs at commercial office to prevent health and safety risk.
Filling of Pothole
Filling of pothole with cold tarmac to prevent trip hazard and standing water build up.
Installation of motion sensor and external light
Installation of external light and motion sensor for commercial building.