Our planned maintenance team attended a commercial premises and supplied and applied Thermoplastic road line material in accordance with EN 1871 to form markings.
Markings included.
Single and Double arrows
Central road lines
3x Junctions
Lettering in the Visitors parking area
Entire line along the top of the main car park covering bays and junctions out of each row
RECENT JOBS
Repair of ‘Bollard Light’
Having bollards and lights securely fixed prevents vandalism and increased reactive costs.
Tap Replacement
Replacement of tap - we’re happy to help however small the job.
Investigation of water ingress
Often blocked gutters can cause significant problems, these can be avoided by performing regular gutter clearance.
Decoration of Stairwell
Decoration of stairwell.
Earth Works
Is your site secure from unwanted visitors? The construction of a trench to prevent unauthorised caravans/vehicles from entering.
Ensuring Christmas Happens
Visited site to ensure that all Christmas light sockets were operational!