Our groundworks team attended a commercial building carpark to supply and fit water gullies. Old covers were dismantled and removed and 6 new gully covers were installed
RECENT JOBS
Installation Aco drain
Groundworks team installed removed existing damaged drainage channel and installed new ACO drain.
Refurbishment of Fire Escape
As part of a planned maintenance schedule in response to a Fire Risk Assessment we cleaned , applied non slip finish , highlighted nosings, painted fire door and applied D-handle to fire escape and fire exit.
Door Frame Repair
Our carpentry team responded to a reactive maintenance request to repair the door frame of the ladies toilets in an office building.
Fitting of Hand Dryer
Fitting of a new hand dryer in ladies tiles of office as part of a refurbishment.
Road Resurfacing
Road resurfacing at health club by digging out arisings laying concrete and then a top covering of tarmac.
Installation of ramp
Installation of ramp at office building as part of planned maintenance review following a heath and safety audit.