Attended commercial site and carried out an electronic roof survey to determine cause of leak.
Carried out all repairs required to prevent future leaks.

RECENT JOBS

Groundworks

Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.

2024-11-20T16:14:35+02:00
Go to Top