Our commercial roofing team attended an industrial site in order to remove all current lead flashing as it had deteriorated due to amount sitting water.
Cut out new chase for new leadwork to be installed.
Install new 12 inch leadwork into parapet all leadwork pointed with lead sealant.
Parapet dried out and new rubber waterproof coating to be applied to entire parapet.
New mesh ball installed over down pipe to prevent debris from blocking down pipe again.
RECENT JOBS
Manhole repair
Our planned maintenance team attended an industrial park in order to repair a damaged manhole frame.
Removal of graffiti
Our reactive maintenance team attended a commercial premises to remove graffiti that had little artistic merit.
Light installation
Our planned maintenance team attended an industrial centre to Install 3 PIR sensor lights
Bracket replacement for screens shielding car park
Our planned maintenance team attended a car park at a commercial centre in order to replace the brackets holding in place the shielding screens for the multi storey car park.
Lock replacements
Our locksmith attended a commercial office in order to replace locks in the building
Line marking retail park
Our planned maintenance team attended a retail park out of hours and completed an extensive line marking exercise