Our commercial roofing team attended an industrial site in order to remove all current lead flashing as it had deteriorated due to amount sitting water.
Cut out new chase for new leadwork to be installed.
Install new 12 inch leadwork into parapet all leadwork pointed with lead sealant.
Parapet dried out and new rubber waterproof coating to be applied to entire parapet.
New mesh ball installed over down pipe to prevent debris from blocking down pipe again.
RECENT JOBS
Provision of cycling resources
Our planned maintenance team attended a commercial office building to supply and install a freestanding compact public bike pump.
Replacement of Drains
Our planned maintenance team attended a retail park to replace a damaged ACO channel.
Ice-cream van damage repair
Our groundworks team attended a retail park in order to repair a bollard and loose payment slabs damaged by an ice cream van.
Electrical repair
Our planned maintenance team attended a corporate gym in order to replace the gym floor.
Sticking door
Our reactive maintenance team attended a retail site in order to repair a sticking door that had swollen due to the bad weather.
Water ingress inspection
Our roofing team attended a central London commercial building in order to investigate water ingress.