Our commercial roofing team attended an industrial site in order to remove all current lead flashing as it had deteriorated due to amount sitting water.
Cut out new chase for new leadwork to be installed.
Install new 12 inch leadwork into parapet all leadwork pointed with lead sealant.
Parapet dried out and new rubber waterproof coating to be applied to entire parapet.
New mesh ball installed over down pipe to prevent debris from blocking down pipe again.
RECENT JOBS
Re-lay of slabs
Two man groundworks team attended a central London commercial location.
Replacement of manhole cover
Our groundworks team attended an industrial estate in order to replace a gas cover.
Decorating of investment property
An investment property as part of a client portfolio was attended by our planned maintenance team.
Repair of fire escape gate
Our reactive maintenance team attended an industrial park in order to repair a gate that was unable to open - the gate also acts as a fire escape route
Larger bird boxes!
We returned to a commercial site where previously bird boxes had been installed in order to install some roomier boxes to cater for the larger bird!
Installation of Palisade fencing
Our planned maintenance team installed a palisade fence in order to prevent fly tipping at an industrial site.