Our commercial roofing team attended an industrial site in order to remove all current lead flashing as it had deteriorated due to amount sitting water.
Cut out new chase for new leadwork to be installed.
Install new 12 inch leadwork into parapet all leadwork pointed with lead sealant.
Parapet dried out and new rubber waterproof coating to be applied to entire parapet.
New mesh ball installed over down pipe to prevent debris from blocking down pipe again.
RECENT JOBS
Gutter Cleaning
Our planned preventative maintenance team attended in order to clear gutters on a business park.
Roof inspection and repair
Our commercial roofing team travelled to The Midlands to inspect and repair a roof suffering from water ingress.
Replacement of faulty lights
Our electrical team attended an emergency call out and replaced faulty lights.
Brickwork at retail centre
Our reactive maintenance team attended a retail centre in order to repair brickwork in response to a health and safety report.
Car park Lining
Our planned maintenance team attended a commercial premises and supplied and applied Thermoplastic road line material to form markings.
Installation of bollard sleeves
Our reactive maintenance team attended a retail/industrial site and fitted bollard sleeves securely.