Our commercial roofing team attended an industrial site in order to remove all current lead flashing as it had deteriorated due to amount sitting water.
Cut out new chase for new leadwork to be installed.
Install new 12 inch leadwork into parapet all leadwork pointed with lead sealant.
Parapet dried out and new rubber waterproof coating to be applied to entire parapet.
New mesh ball installed over down pipe to prevent debris from blocking down pipe again.
RECENT JOBS
Canteen refurbishment
Our refurbishment team attended the canteen of a commercial premises.
Damaged wall due to plant growth
Our reactive maintenance team attended a commercial premises where there was plant growth damaging a rear wall.
Refurbishment
Planned maintenance of stairwell of commercial building.
Clearance of fire escape
In response to a Fire Risk Assessment our reactive maintenance team attended an industrial site.
Hand sanitiser installation
Our preventative maintenance team installed hand sanitiser and signage throughout a commercial premises to ensure that health and safety guidance relating to the corona was followed and the premises were COVID-19 SECURE .
Corona signage and sanitiser stations
Our preventative maintenance team attended a commercial premises in order to install signage and hand sanitiser stations to ensure that the premises with the health and safety guidance as regards the corona.