Our commercial roofing team attended an industrial site in order to remove all current lead flashing as it had deteriorated due to amount sitting water.
Cut out new chase for new leadwork to be installed.
Install new 12 inch leadwork into parapet all leadwork pointed with lead sealant.
Parapet dried out and new rubber waterproof coating to be applied to entire parapet.
New mesh ball installed over down pipe to prevent debris from blocking down pipe again.

RECENT JOBS

Brickwork Repair

Following the identification of a pillar in disrepair our reactive maintenance team attended site. They toothed out all broken brick work in the pillar and re-layed new bricks to rebuild the pillar.

FRA Response

Our maintenance team attended a central London office to deal with recommendations post a Fire Risk Assessment. One of which was to relocate the fire extinguishers.