Our commercial roofing team attended an industrial site in order to remove all current lead flashing as it had deteriorated due to amount sitting water.
Cut out new chase for new leadwork to be installed.
Install new 12 inch leadwork into parapet all leadwork pointed with lead sealant.
Parapet dried out and new rubber waterproof coating to be applied to entire parapet.
New mesh ball installed over down pipe to prevent debris from blocking down pipe again.
RECENT JOBS
Installation of fire exit
A 2 man team removed the existing structure to create a new fire exit.
Laying of new floor
Our carpet fitters attended a commercial site to lay a new floor
Installation of knee rail fencing
Our carpentry team attended a retail park in order to install a wooden knee fence to prevent footfall through a ’shortcut’ with potential health and safety consequences.
Install wooden ramp
Our carpentry team attended an industrial site in oder to replace a widen ramp that had been highlighted in a health and safety review.
Fire stopping
Fire stopping / fire door team attended a commercial office building.
Bollar refurbishment
Our decorating team attended an industrial park in order to refurbish 36 bollards - a mix of metal and concrete.