Our commercial roofing team attended an industrial site in order to remove all current lead flashing as it had deteriorated due to amount sitting water.
Cut out new chase for new leadwork to be installed.
Install new 12 inch leadwork into parapet all leadwork pointed with lead sealant.
Parapet dried out and new rubber waterproof coating to be applied to entire parapet.
New mesh ball installed over down pipe to prevent debris from blocking down pipe again.
RECENT JOBS
Installation of steel mesh
Installation of steel mesh - Are your fire exits secure from unauthorised access?
Relaying of Roof to Prevent Water Ingress
Sometimes the original design of a roof can be altered at little cost compared to a new roof to mitigate water ingress.
Temporary Liquid Resin Treatment
The application of liquid resin to areas suffering water ingress can be an efficient and cost effective approach pending more substantial investment.
Relay of Carpet
Loose carpet can be a trip hazard and is easily corrected.
Installation of Bollards
Installing bollards to prevent damage to walls can reduce longer term costs.