Our commercial roofing team attended an industrial site in order to remove all current lead flashing as it had deteriorated due to amount sitting water.
Cut out new chase for new leadwork to be installed.
Install new 12 inch leadwork into parapet all leadwork pointed with lead sealant.
Parapet dried out and new rubber waterproof coating to be applied to entire parapet.
New mesh ball installed over down pipe to prevent debris from blocking down pipe again.
RECENT JOBS
Removal of bird waste from flat roof.
Removal of bird waste from flat roof.
Outer Buildings Gutter Clean
Cleaning of gutters to prevent water ingress using spider boom and self propelled boom.
Preparation for New Tennants
Workman attended to ensure that all signage left by previous tenant was removed in preparation for new tenants’ arrival.
Locksmith / Window Locks
A locksmith attended to ensure that window locks operated effectively and hence were effective in securing the building.