Our commercial roofing team attended an industrial site in order to remove all current lead flashing as it had deteriorated due to amount sitting water.
Cut out new chase for new leadwork to be installed.
Install new 12 inch leadwork into parapet all leadwork pointed with lead sealant.
Parapet dried out and new rubber waterproof coating to be applied to entire parapet.
New mesh ball installed over down pipe to prevent debris from blocking down pipe again.

RECENT JOBS

Decking

Decking can be a cost effective method of covering potential health and safety hazards whilst still allowing access to drain covers.

2021-12-18T15:48:52+02:00
Go to Top