Our commercial roofing team attended an industrial site in order to remove all current lead flashing as it had deteriorated due to amount sitting water.
Cut out new chase for new leadwork to be installed.
Install new 12 inch leadwork into parapet all leadwork pointed with lead sealant.
Parapet dried out and new rubber waterproof coating to be applied to entire parapet.
New mesh ball installed over down pipe to prevent debris from blocking down pipe again.

RECENT JOBS

Bike Racks

Installation of bike racks at Richmond office - New bike racks installed so as the tenant could encourage cycling to work saving parking costs.

2021-12-18T15:48:52+02:00
Go to Top