Our commercial roofing team attended an industrial site in order to remove all current lead flashing as it had deteriorated due to amount sitting water.
Cut out new chase for new leadwork to be installed.
Install new 12 inch leadwork into parapet all leadwork pointed with lead sealant.
Parapet dried out and new rubber waterproof coating to be applied to entire parapet.
New mesh ball installed over down pipe to prevent debris from blocking down pipe again.
RECENT JOBS
Installation of Bollards
Installation of Bollards.
Lighting Ornamental Stone
Lighting the ornamental stone bearing a shopping centre name.
External Steps
Repair of step to remove trip hazard.
Steel Edge Protection
Installation of plant, edge and isolation switch protection and gates.
Steel Gates
Fitting of steal access gates to stories to comply with regulations.
Water Ingress
Report commissioned to investigate water Ingress at commercial office.








