Supplied, delivered and assembled an open fronted smoking shelter 2m x 1m (For 3-5 people)
Lifted paving slabs to be able to concrete feet into the ground if just fixed to slabs there will be a risk of it dislodging in strong winds
Colours – black, light grey, blue or green
Installed a hooded top tower smoking bin in stainless steel
Compliant with Smoking Ban Legislation – Parliament Act 3368
Steelwork is zinc and epoxy powder coated for effective corrosion resistance and longevity
RECENT JOBS
Replacement concrete bollards
Our groundworks team attended a Midlands industrial estate in order to repair damaged concrete bollards.
Fire door replacement
Our reactive maintenance team attended a West End office building in order to replace a fire door.
Block paving repair
Our groundworks team attended an office centre after a number of heavy goods vehicles had damaged the block paving.
Repair of brickwork
Our reactive maintenance team attended a business centre in order to repair a damaged wall.
Replacement glass unit to office conservatory
Our planned maintenance team attended a commercial office in order to replace the damaged glazing on an internal conservatory.
Access door repair
Floor spring and bottom shoe replacement of door