Supplied, delivered and assembled an open fronted smoking shelter 2m x 1m (For 3-5 people)
Lifted paving slabs to be able to concrete feet into the ground if just fixed to slabs there will be a risk of it dislodging in strong winds
Colours – black, light grey, blue or green
Installed a hooded top tower smoking bin in stainless steel
Compliant with Smoking Ban Legislation – Parliament Act 3368
Steelwork is zinc and epoxy powder coated for effective corrosion resistance and longevity
RECENT JOBS
Re-lay of slabs
Two man groundworks team attended a central London commercial location.
Replacement of manhole cover
Our groundworks team attended an industrial estate in order to replace a gas cover.
Decorating of investment property
An investment property as part of a client portfolio was attended by our planned maintenance team.
Repair of fire escape gate
Our reactive maintenance team attended an industrial park in order to repair a gate that was unable to open - the gate also acts as a fire escape route
Larger bird boxes!
We returned to a commercial site where previously bird boxes had been installed in order to install some roomier boxes to cater for the larger bird!
Installation of Palisade fencing
Our planned maintenance team installed a palisade fence in order to prevent fly tipping at an industrial site.