Supplied, delivered and assembled an open fronted smoking shelter 2m x 1m (For 3-5 people)
Lifted paving slabs to be able to concrete feet into the ground if just fixed to slabs there will be a risk of it dislodging in strong winds
Colours – black, light grey, blue or green
Installed a hooded top tower smoking bin in stainless steel
Compliant with Smoking Ban Legislation – Parliament Act 3368
Steelwork is zinc and epoxy powder coated for effective corrosion resistance and longevity
RECENT JOBS
Refurbishment of flat
Refurbishment of a residential flat above commercial for an investor
Emergency patchwork repairs to roof
Following heavy rains our reactive team attended a commercial building to provide emergency patchwork repairs using liquid resin to a flat roof to prevent short term water ingress.
Line Marking
Our groundworks team attended following a health and safety review and improved the marking for pedestrians in a commercial carpark.
Digital Lock
We attended site following a fire risk assessment and fitted a digital lock to the common parts electrical riser.
Relay block paving
Following a health and safety review that identified a number of slip hazards our groundworks team attended and relaid the block paving round a manhole cover.