Supplied, delivered and assembled an open fronted smoking shelter 2m x 1m (For 3-5 people)
Lifted paving slabs to be able to concrete feet into the ground if just fixed to slabs there will be a risk of it dislodging in strong winds
Colours – black, light grey, blue or green
Installed a hooded top tower smoking bin in stainless steel
Compliant with Smoking Ban Legislation – Parliament Act 3368
Steelwork is zinc and epoxy powder coated for effective corrosion resistance and longevity
RECENT JOBS
Christmas tree installation
Our reactive Elves team purchased a number of Christmas trees and decorations for a large commercial building in Cambridge. Trees were then installed and decorated.
Temporary roof repairs
Our roofing team carried out temporary commercial roof repairs to a commercial building prior to more substantive replacement in the next financial year. EPDM and liquid resin were applied.
Decorating and refurbishment
Our decorating team attended and repainted a complete flat for an investment landlord prior to new tenants moving in.
Lock replacement
Our locksmith attended a commercial building in order to replace a lock so that there was a thumb turn on the inside to allow people to exit the building without a key.
Relay paving stones
The groundworks team attended a retail park where damaged paving stones represented a trip hazard and relaid.
Collapsed Manhole Cover
Our groundworks team attended an industrial park in order to repair frame and cover of collapsed manhole highlighted by a health and safety review. .







