Supplied, delivered and assembled an open fronted smoking shelter 2m x 1m (For 3-5 people)
Lifted paving slabs to be able to concrete feet into the ground if just fixed to slabs there will be a risk of it dislodging in strong winds
Colours – black, light grey, blue or green
Installed a hooded top tower smoking bin in stainless steel
Compliant with Smoking Ban Legislation – Parliament Act 3368
Steelwork is zinc and epoxy powder coated for effective corrosion resistance and longevity
RECENT JOBS
Repair of Pathways and Roads
Repair of pathways and roads at medical centre.
Solid Gate
Solid Gate installed at commercial building.
Gate Installation
Installation of security gate with vehicle and pedestrian access at commercial office building.
Bathroom Refurbishment
Refurbishment of commercial bathroom.
Gate Construction
Construction of pedestrian and vehicle gate at commercial building.
Refurbishment of Flat
Flat refurbishment including decorating - boxing in of flue and carpet cleaning.