Supplied, delivered and assembled an open fronted smoking shelter 2m x 1m (For 3-5 people)
Lifted paving slabs to be able to concrete feet into the ground if just fixed to slabs there will be a risk of it dislodging in strong winds
Colours – black, light grey, blue or green
Installed a hooded top tower smoking bin in stainless steel
Compliant with Smoking Ban Legislation – Parliament Act 3368
Steelwork is zinc and epoxy powder coated for effective corrosion resistance and longevity
RECENT JOBS
Emergency Repair
Emergency 2 hour repair to damaged height restrictor at Oxford retail park.
Bollard Repair
Repair of damaged raised bollard.
Gutter Clearance
It is obviously important that gutters are kept clear in autumn to prevent water ingress.
Fire Strips
Installation of intumescent strips on fire doors post a Fire Risk assessment.
Refresh of external entrance areas
Pressure washing and sealing of cracks can give external areas an aesthetic uplift.