Supplied, delivered and assembled an open fronted smoking shelter 2m x 1m (For 3-5 people)
Lifted paving slabs to be able to concrete feet into the ground if just fixed to slabs there will be a risk of it dislodging in strong winds
Colours – black, light grey, blue or green
Installed a hooded top tower smoking bin in stainless steel
Compliant with Smoking Ban Legislation – Parliament Act 3368
Steelwork is zinc and epoxy powder coated for effective corrosion resistance and longevity
RECENT JOBS
Electrical Earthing Point
Uplift and relay of pavement in order to upgrade earthing rod to ensure compliant with regulations.
Lead Guttering Using Harnesses
Lifting and replacement of lead guttering following resin patch repairs using harnesses.
Gutter Repair
Repair of guttering preventing water ingress at residential flat.
Cleaning External
Cleaning and refreshing external parts of commercial building prior to being relet.
Boarding Up
Emergency call out to board up broken window on 3rd floor of office.
Loose Steps
Lifted and reattached front steps to commercial office to remove trip hazard.







