Our preventive maintenance team attended a commercial premises in order to install signage – directional and instructional to ensure that the site complied with health and safety guidance to prevent the corona. .

RECENT JOBS

Groundworks

Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.

2020-06-30T12:38:45+02:00
Go to Top